The initial park features a capacity of 200 MW whilst Sandrini II provides a capability of 100 MW. The full price of each assignments were not disclosed on the other hand, through design, around 200 staff were being used. The jobs are envisioned to find out a handful of positions https://solarinstallernearme.blogspot.com/2024/12/how-to-save-more-on-your-monthly-energy.html