Penmann recently finalised a complex HVAC upgrade at Nutricia’s Liverpool facility, implementing a purpose-built ventilation and climate control system engineered to meet stringent hygiene and production criteria. The scope included the end-to-end implementation of high-specification HVAC systems across civil, Medium Care (MC) and High Care (HC) areas. Based on Nutricia’s https://exactlybookmarks.com/story20600803/penmann-ltd-completes-specialist-hvac-installation-for-the-liverpool-based-nutricia-facility-in-line-with-fsi-phase-1-and-2